Wow!  I did not realize how long it has been since posting. All the interior cabinetry  and floors are completed. The fire sprinkler system is completed and alarmed. The electrical and lighting is all completed. We also completed the steel framing and aluminum decking. The front entry is done, and the driveway and all the approaches are repaved. We had a pre-final inspection, and there are only a few things to complete before we can occupy the structure. So here are some pics of all the latest work.

The deck. This was a big thing. All the planning and calculations and hoping we had ordered a sufficient amount of material. We had attached the ledgers prior to stuccoing the exterior. It was like building a big erector set (I may be dating myself there).

steel joists and ledger for 2nd floor

The  framing:

completed deck framing

Once that was done it was off to LA to pick up the decking material. Our choice was called TB-940 safe-t-grid from McNichols Co.  We wanted to minimize maintenance and also needed a minimum weight bearing capacity of 200lbs. per square foot for the second floor deck. Using steel box beams for joists and the aluminum deck we have a capacity of around 1000 lbs. per square foot. The shipping was very expensive so we borrowed a trailer and picked up the decking ourselves.

Aluminum decking strapped down and ready for the long ride home.

All the decking is pre-cut to fit your square footage of deck so there is basically no cut off or waste.

first floor deck

and second floor deck with cross-bracing:

These are the stair treads.

You can now see the reason for the weight bearing capacity, we moved a hot tub onto the upper deck. Once the stairs and guardrails are installed we can get final inspection. Yay!

In the meantime we also completed some other items:

We finished the front entry area by adding a step and using the left over pavers from the patio.

Front steps and pavers and a curved planter in front of the house

We repaved the driveway approach and patched all the cut outs in the driveway.

Approach and curbing.

Don’t mess with a woman and her steamroller!

And here are the completed bamboo floors:

So we are still busy every day with the final steps. There are a million small details that need completing as we go along and we are just a few weeks away from occupancy!

Read Full Post »