We had the stair treads and risers cut and fit today. They are going to look good.

DSCN0187

 

DSCN0184

The cats are beginning to feel at home….DSCN0183

Read Full Post »

Wow!  I did not realize how long it has been since posting. All the interior cabinetry  and floors are completed. The fire sprinkler system is completed and alarmed. The electrical and lighting is all completed. We also completed the steel framing and aluminum decking. The front entry is done, and the driveway and all the approaches are repaved. We had a pre-final inspection, and there are only a few things to complete before we can occupy the structure. So here are some pics of all the latest work.

The deck. This was a big thing. All the planning and calculations and hoping we had ordered a sufficient amount of material. We had attached the ledgers prior to stuccoing the exterior. It was like building a big erector set (I may be dating myself there).

steel joists and ledger for 2nd floor

The  framing:

completed deck framing

Once that was done it was off to LA to pick up the decking material. Our choice was called TB-940 safe-t-grid from McNichols Co.  We wanted to minimize maintenance and also needed a minimum weight bearing capacity of 200lbs. per square foot for the second floor deck. Using steel box beams for joists and the aluminum deck we have a capacity of around 1000 lbs. per square foot. The shipping was very expensive so we borrowed a trailer and picked up the decking ourselves.

Aluminum decking strapped down and ready for the long ride home.

All the decking is pre-cut to fit your square footage of deck so there is basically no cut off or waste.

first floor deck

and second floor deck with cross-bracing:

These are the stair treads.

You can now see the reason for the weight bearing capacity, we moved a hot tub onto the upper deck. Once the stairs and guardrails are installed we can get final inspection. Yay!

In the meantime we also completed some other items:

We finished the front entry area by adding a step and using the left over pavers from the patio.

Front steps and pavers and a curved planter in front of the house

We repaved the driveway approach and patched all the cut outs in the driveway.

Approach and curbing.

Don’t mess with a woman and her steamroller!

And here are the completed bamboo floors:

So we are still busy every day with the final steps. There are a million small details that need completing as we go along and we are just a few weeks away from occupancy!

Read Full Post »

Well, it has been a prodigiously long time since I updated any pictures and much has happened.  Once the plastering was completed and the front door set, we took a little break and spent a month in France! We visited friends and relatives and bicycled all over the Loire Valley and in the south of France. It was fantastic to get away from work although I didn’t know how much we needed a break.  We rode along the Loire river through small villages on the way to Chenonceau and all the stress seemed to melt away. Oh, and did I mention that if you ride every day….then you can eat everything in sight!  Which is pretty much what we did.

Pastry in Chinon…..

Bike trail to Chenonceau

further south

When we returned, it was right back to work on the house. We set all the cabinets in the kitchen, laundry room and bathrooms…

counters, hood and ’52 Wedgewood ready to go.

a larger oven and a dishwasher! (our first)

the bamboo butcher block in progress

laundry room

One thing we have always enjoyed are glass awnings. When I was growing up, many of the art deco buildings in Pasadena had glass awnings with the wired safety glass in them. On my first trip to France I was thrilled to see so many glass awnings and swore if I ever got the chance to build one I would. I was able to find some trick hardware from CR Laurance for a modern awning and we powder coated our roof panel lifting plates and attached them to the wall as anchor points. We had to use 9/16″ safety glass and it was tricky to get it up and in place, but we are really happy with the results.

This is our modern  glass awning. We chose blue glass, which  looks the best with our building.

We also installed all the cabinets in the bathrooms and the fixtures:

Floating cabinets and a vessel sink from China. The sink was a gift from Ariane’s good friend Marie who did a ceramics artist in residency there.

 sink interior

Bathroom with glass shower installed

Ariane and I are now busy laying the floors upstairs.

bamboo floor in closet

Almost finished with the master bedroom Most all of the electrical outlets are functional, all but a few of the lights are installed, and the sound system is working so we can listen to music in each room.

Our fabulous foyer light fixture, the moon of Meepzorp

A wall sconce made by Barry Frantz looks terrific.

We continue to plod along every day, trying to get out of our trailer before Christmas!